Accomac Primary School Renovation Bid
No individual position is attributed here. Locality context: Accomack County.
Collective action: On motion by Mr. Taylor seconded by Mr. Neal, the Board approved to move forward with the two auxiliary gyms with Dr. Johnson and Ms. Handy absent and Mr. White voting no. - Accomac Primary o Bid opened on December 5 o Approval for Harkins Contracting o Not included in bid FF&E allowance A/V equipment allowance Design/CA Fees Owners construction contingency @ 2% of ECC $1.1M owner costs o Total Cost $9.9M Mrs. Turner wanted to know the expected yearly cost for the Hampton Roads sanitation connecting. - Mr. Bennett said he thinks the connecting fee is covered in this, but need to follow up to make sure. There will be annual fees with the septic system. A long- term solution is the sanitary lines is the way to go. On motion by Mr. Taylor seconded by Mr. Weippert, the Board approved to accept Harkins Contracting for Accomac Primary construction with Dr. Johnson and Ms. Handy absent. Mr. Bennett said for the storage building, they will be bringing that back to the Board in February. It will have to be more than a storage building. His department is taking up a lot of real-estate at Nandua High and Food service has valuable real-estate at Arcadia High. Building need to be more than for storage, it need to be a complex for facilities and food service where we can have all of our shipping and receiving. The location for this has been bounced around to Accawmacke Elementary or Metompkin Elementary. Metompkin Elemenary would be the most desirable because of the truck deliveries. - Mr. Taylor wanted to know if there is any land around the bus depot. o Mr. Bennett said that he would have to look. - Mrs. Turner said she thought Food Service were going to move into the primary building. o Mr. Bennett said they are, but it would be for their storage stuff and dry goods. They had two whole rooms at Accomac Primary with dry goods.
Evidence details
- Date
- Dec 17, 2024
- Action type
- School Board Minutes Action
- Government body / source context
- Accomack County School Board
- Source
- BoardDocs approved meeting minutes
- Original source link
- Open source ↗
Association notes from the source record
- Government body / source context
- Accomack County School Board
- Office at time
- Accomack County School Board
- District at time
- Not available
- Government level at time
- Local
On motion by Mr. Taylor seconded by Mr. Neal, the Board approved to move forward with the two auxiliary gyms with Dr. Johnson and Ms. Handy absent and Mr. White voting no. - Accomac Primary o Bid opened on December 5 o Approval for Harkins Contracting o Not included in bid FF&E allowance A/V equipment allowance Design/CA Fees Owners construction contingency @ 2% of ECC $1.1M owner costs o Total Cost $9.9M Mrs. Turner wanted to know the expected yearly cost for the Hampton Roads sanitation connecting. - Mr. Bennett said he thinks the connecting fee is covered in this, but need to follow up to make sure. There will be annual fees with the septic system. A long- term solution is the sanitary lines is the way to go. On motion by Mr. Taylor seconded by Mr. Weippert, the Board approved to accept Harkins Contracting for Accomac Primary construction with Dr. Johnson and Ms. Handy absent. Mr. Bennett said for the storage building, they will be bringing that back to the Board in February. It will have to be more than a storage building. His department is taking up a lot of real-estate at Nandua High and Food service has valuable real-estate at Arcadia High. Building need to be more than for storage, it need to be a complex for facilities and food service where we can have all of our shipping and receiving. The location for this has been bounced around to Accawmacke Elementary or Metompkin Elementary. Metompkin Elemenary would be the most desirable because of the truck deliveries. - Mr. Taylor wanted to know if there is any land around the bus depot. o Mr. Bennett said that he would have to look. - Mrs. Turner said she thought Food Service were going to move into the primary building. o Mr. Bennett said they are, but it would be for their storage stuff and dry goods. They had two whole rooms at Accomac Primary with dry goods.
View this association's source ↗